热门标签

KPower gets four-year PPA extension

时间:1个月前   阅读:3

皇冠管理端登3手机www.99cx.vip)实时更新发布最新最快最有效的皇冠管理端登3手机网址,包括新2登3手机网址,新2登3备用网址,皇冠登3最新网址,新2足球登3网址,新2网址大全。

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

PETALING JAYA: KPower Bhd’s subsidiary – PKNP KPower Suria Sdn Bhd (PKSSB) – has obtained an extension from the Energy Commission (EC) for the development of a 50MW solar photovoltaic plant in Pahang.

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

,

以太坊开奖www.326681.com)采用以太坊区块链高度哈希值作为统计数据,以太坊开奖(联博统计)数据开源、公平、无任何作弊可能性。联博统计免费提供API接口,支持多语言接入

,

KPower said the scheduled commercial operation date had been extended to Dec 31, 2023 from Sept 30, 2023 while the tenure of the power purchase agreement or PPA was from 21 years to 25 years.


转载说明:本文转载自Sunbet。

上一篇:Ringgit extends downtrend vs US$ on stronger US economic data

下一篇:Bursa Malaysia closes broadly lower on continued profit-taking

网友评论